Flooding in September, 2013 impacted thousands of County residents. A major contributor to that impact was the devastating damage to much of the County road system. Temporary emergency repairs to reestablish access to properties in the affected areas have been completed and plans for permanent repairs are underway.

A Transportation Bulletin was published each week summarizing construction efforts.

Transportation Bulletins

Road Closures


Construction Updates

Other Current Information:

Need proof of inability to access your property/home for FEMA?

Summary Map of Flood Damage to County Road System 9-24-13

Map of which roadways have been assessed through 9-20-13



Colorado Department of Transportation (CDOT)

US 34 (Big Thompson Canyon), SH 14 in the Poudre Canyon, US 36 through Pinewood Springs, and SH 7 south of Estes are state highways and are under the jurisdiction of CDOT. An initial assessment of their roads has been completed.

More information on CDOT efforts to repair roads can be found at:

Hotline: 1-800-999-4997
Email: dot_flood@state.co.us
Facebook: www.facebook.com/coloradoDOT
Background Image: Dream Lake frozen over in Rocky Mountain National Park by Bryce Bradford. All rights reserved.