Road Closures and Construction Delays

Subscription Service

Subscribe (or unsubscribe) and receive road closure notices in your email inbox. RSS

The following list of road projects and maintenance resurfacing projects are currently planned. These projects are planned for unincorporated Larimer County and may result in traffic delays. The list of projects does not include work on state highways or city streets. Maintenance resurfacing projects include chipseals, slurry seals, grader patch and base stabilizations. All projects require moderate to good summer time weather and are subject to delays from weather and/or the availability of materials. Please be advised of the possibility that proposed work might not be completed in time or that additional projects could be added during the summer season. All projects are subject to change.

Flood 2013 road closure map  | Map of all County road closures

Flood response/repair road information: Progress to date | Work planned

Weather Related

Road number
Road name
From To Start date End date Contact Reason Type Expected delay
22H
CR 22H (Part 1)
US 34 9597 CR 22H 09/13/13
12:00 AM

LC R&B
970-498-5650
Restricted access to local traffic. September 2013 Flood. Reviewed 10/3/14 Restricted Access Only  
22H
CR 22H (Part 2)
9597 CR 22H CR 29 09/12/13
12:00 AM

LC R&B
970-498-5650
September 2013 Flood. Opening yet TBD, closed and signed. Those who proceed beyond the "Road Closed" sign do so at their own risk. Reviewed 10/3/14. Full Closure  
31D
CR 31D
CR 22H End 09/12/13
12:00 AM

LC R&B
970-498-5650
September 2013 Flood. Opening TBD, closed and signed. Those who proceed beyond the "Road Closed" sign do so at their own risk. Reviewed 10/2/14. Full Closure  
29
CR 29
approx. 1 mile north Hwy 34 approx. 2 miles SW of CR 27 09/12/13
12:00 AM

LC R&B
970-498-5650
September 2013 Flood. Opening TBD, closed and signed. Those who proceed beyond the "Road Closed" sign do so at their own risk. NO TRUCK TURNAROUND. Reviewed 10/2/14. Full Closure  
59
CR 59
County Line End of County Maintenance 09/11/13
08:00 AM

LC R&B
970 498 5650
Permanent work yet to be done. Reviewed 10/2/14 Restricted Access Only  

Seasonal/Emergency Closure

Road number
Road name
From To Start date End date Contact Reason Type Expected delay
99
CR 99
CR 103 Glendevey 12/18/14
12:00 AM
04/01/15
12:00 AM
LC R&B
970-498-5650
Seasonal Closure Full Closure  
44H
Pennock Pass
Gate past the Ranger Station CR 63E 12/05/14
12:00 AM
05/01/15
12:00 AM
Jim Frick
498-5663
Seasonal Closure Full Closure  
103
Laramie River Rd
SH 14 (at Chambers Lake) CR 99 11/24/14
12:00 AM
04/18/15
12:00 AM
Jim Frick
970-498-5663
Seasonal Closure Full Closure  

Recently Opened

Road number
Road name
From To Start date End date Contact Reason Type Expected delay
27
CR 27 (Buckhorn/Stove Praire Rd)
18000 Buckhorn Rd Ohana Way 09/12/13
12:00 AM
12/24/14
12:00 AM
Matt Johnson
970-498-5724
Road is open with gravel surface as of December 24, 2014. Construction will continue throughout the winter and spring. The road will remain open with periodic delays. Paving will be in the spring. Newsletter: http://larimer.org/engineering/cr_27.pdf or Project sheet: http://www.larimer.org/engineering/projects/Stat9323.htm Open  

Construction Related

Road number
Road name
From To Start date End date Contact Reason Type Expected delay
11
Boise Ave
East 1st Street - Loveland Hwy 402 NEW:
02/04/15
12:00 AM
02/11/15
06:00 AM
Marc A. Lyons
970-498-5709
Installing duct bank (water, sanitary sewer, and electric) across the river and installing a temp sanitary sewer by-pass line while the new main is installed. This work is for the City of Loveland Utilities. Traffic Control has coordinated with the City of Loveland and CDOT for this closure. Variable Message Boards are up for one week prior to closure of roadway. Full Closure Detour in place - follow detour route
Detour map
73C
Creedmore Lakes Road
Crow Road (Apporx.) Lost Lake Road 01/14/15
12:00 AM
01/31/15
06:00 PM
Justin Hersh
970 498-5662
U.S.F.S Contractor will be performing hazard tree mitigation along CR 73C. All private properties will be accesible as normal- closure to take place with in Forrest Service frontage. Full Closure Full Closure
17
Shields Street
Willox Lane Vine Drive 01/05/15
12:00 AM
07/03/15
12:00 AM
Lindsey Chalfant - COFC
970-221-6700
The City of Fort Collins Sanitary Sewer Department and Garney Construction will be installing a new Sanitary Sewer main in Shields Street from the Poudre River to Vine Drive during the time frame listed above. the roadway will be closed to all through traffic. Please use the detour that is set up around the construction zone. Full Closure Detour route in place during closure
Detour map
17
Shields Street
Vine Drive Willow Lane 12/01/14
12:00 AM
01/04/15
05:30 AM
Linsey R. Chalfant, PE
970.222.6089
City of Fort Collins Sanitary Sewer Department is placing new line across the Poudre River. Open 5 Min. for Trucks Turning into Roadway
43
CR 43 (Devils Gulch)
US 34 (at Drake) Glen Haven 10/13/14
12:00 AM

Erich Purcell
970-498-5733
Construction started in October. Delays are posted on Thursdays for the upcoming week. Expect 60 minute delays. For Project Summary information: http://larimer.org/engineering/PROJECTS/Stat9386.htm, http://larimer.org/engineering/cr_43.pdf or visit http:www.lcr43.com for Delay schedule Delay Pilot cars top of the hour
3
County Road 3
CR 20C CR 18 08/18/14
12:00 AM
02/20/15
06:00 PM
Marc A. Lyons
970-498-5709
Contractor will be hauling material from one area to another for two projects for the Town of Johnstown. The roadway is within the Town of Johnstown however Larimer County has one small section of CR 3 that we oversee and maintain. Full Closure Detour route will be in place.
Detour map

Other Road Condition Sites

Background Image: Loveland Bike Trail by Sharon Veit. All rights reserved.